V.TRƯƠNG ĐỨC VINHINTERIORS & LIVING

PROJECT · HỒ CHÍ MINH CITY

Hưng Hóa

Hưng Hóa: 27 apartments, a kiosk, equipment inventory and the 7-year master-lease structure in Ho Chi Minh City.

27apartments
3storeys · ground + 2 upper floors
1 + 1kiosk + parking area

Source review: 26 October 2026. Operation handed over in October 2026 according to the owner. Availability and equipment condition require current confirmation.

A furnished apartment building at 1/12 Hưng Hóa

1/12 Hưng Hóa, Tân Hòa Ward, Ho Chi Minh City (formerly Ward 6, Tân Bình District). The owner’s sales dossier describes a corner building adjoining two roads, with frontages of approximately 22 m and 3.6 m.

Property information from the owner’s dossier
ItemRecord
Land area on certificate198.7 m²
Owner-measured areaApproximately 205 m²; not confirmed by cadastral measurement
Building documentation2015 building permit; completion formalities not yet completed, per sales dossier
Commercial and shared areas1 kiosk, 1 parking area, corridors, stairs and technical areas

Spaces & room layout

Room allocation — contract appendix and management workbook
LevelUnitsUse
Ground floor101–107 · 7 apartments105: 3 bedrooms; 106–107: 2 bedrooms. Room 101 is separate from the kiosk.
First floor201–210 · 10 apartmentsStudio units in the room schedule.
Second floor301–310 · 10 apartmentsStudio units in the room schedule.
Shared / commercial1 kiosk + 1 parking areaKiosk ancillary room only within the actual handover scope.

Equipment for daily living & building operation

The contract appendix lists the following equipment categories. Counts, serial numbers and condition fields remain blank; this is a documented inventory scope, not a completed inspection.

In-apartment equipment
GroupListed equipment
Cooling & laundryAir conditioner, refrigerator and private washing machine.
Storage & kitchenIntegrated wardrobe, kitchen cabinets / stone counter and sink.
BathroomStone-top basin, illuminated mirror, water heater, toilet and shower fittings.
Access & finishesFingerprint door lock, aluminium/glass assemblies, lights, switches, sockets and room circuit breaker.

Room-specific exceptions: management workbook 4.1, last modified 30 September 2026, notes no washing machine in 304 and no refrigerator in 310. Confirm replacements or additions before promising a complete equipment package.

Shared building infrastructure — contract appendix 02
SystemListed quantityScope
Three-phase electricity1 building-wide systemMain meter, distribution board, breakers and wiring per handover.
Internet & load balancing1 shared systemTechnical enclosure and load-balancing equipment.
Security cameras22 cameras12 internal common-area cameras + 10 external cameras; recorder and storage.
Shared dryers3 machinesOne each on ground, first and second floors.
Fire-safety equipmentInventory subject to verificationListed within handover scope; no certification or compliance conclusion is established by this page.

Appendix reference values: Internet system VND 10m; cameras VND 15m; dryers VND 4.5m each. These are contractual reference values, not verified purchase costs or a total project investment.

Master lease & financial context

The supplied version 3.3 describes a 7-year conditional master lease. Signature dates and several handover fields are blank; this file alone does not verify execution, bank approval or completed inventory acceptance. The actual start date follows the effective handover arrangements.

Monthly master rent described in the supplied contract
Lease yearVND million / monthAdjustment
1–2150Unchanged
3163.5+9%
4–7176.58+8% from year 3; then fixed

The contract states a VND 600m performance deposit, equivalent to four months of initial rent. This is a contractual obligation, not evidence of full payment or revenue. Detailed settlement and executed documents are reviewed privately.

Keep three different measures separate
MeasureWhat the source says
Master rentVND 150m/month initially; before applicable costs, taxes and settlement adjustments.
Operating revenueAbout VND 205m/month reported in the owner’s sales dossier; not independently reconciled to a current monthly collection statement.
Net profit / distributable cashNot established. Requires actual receipts, operating costs, taxes, maintenance and prepaid-rent/deposit liabilities.

The construction-spend workbook includes transfers, advances and items requiring allocation. Its raw total is not presented as reconciled project capital. This project is distinct from the Núi Thành transfer model and the six-project partnership illustration.

Status: project-level due diligence pending

Investment basis & due diligence

Separate operating evidence, modelling assumptions and documents still to be reviewed. Supporting records are shared after review and redaction; requesting them does not commit you to invest.

One project · evidence before funding

Capital allocation

VND 350m is an illustrative budget for a proposed new project, not the historical cost of either reference building. Request a dated breakdown of landlord deposit, fit-out, equipment, fees and working reserve, with quotes and payment milestones. Allocation awaits project-specific evidence.

Operating evidence

Review real project photos, room-level leases, rent earned, receipts and expenses for the same period. Reconcile prepaid rent to the months it covers and record refundable tenant deposits as liabilities. A billed total is not collected cash or net profit.

Payback and responsibilities

The 15–17-month project target is an assumption, not investor payback. At a 50% distribution share, equivalent investor payback is 30–34 months before delays under constant cash flow. Count landlord deposit recovery only when received; review vacancy, cost overruns, tax, reserve and exit terms.

Six projects · a separate portfolio review

Six independent files

VND 2.1bn = six illustrative VND 350m budgets; it does not establish six secured properties or repeatable returns. Review each lease, permitted use, fit-out budget, rental assumptions and fire-safety records separately.

Staged funding proposal

Agree milestones for each release: property and documents reviewed, budget approved and operating readiness checked. Set evidence required before the next project, a reserve floor and who approves overruns. These controls remain proposals for written agreement.

Cash calendar and governance

Model staggered opening dates and periods with some units unlet, rather than multiplying one good month by six. Separate investor and operator distributions, losses and further funding; document signing authority, reporting, related-party transactions and exit rights.

For any structure in which Vinh is both landlord and co-investor, use a separate agreement identifying each role, deposit flows and related-party approvals. It is not the standard six-project illustration.

Available public references

These references do not validate a new project’s profit, legal eligibility or safety. The research feed is external context, not property-level verification. Detailed evidence is subject to availability and reconciliation.

Request due diligence records ↗

Source documents & next steps

Documents reviewed / located
SourceScope of review
Hợp đồng thuê khoán Hưng Hóa 7 năm 3.3Room scope, equipment and lease schedule; signature / handover fields remain incomplete.
Hồ sơ Sale Hưng Hóa 1.2.xlsm · 23/10/2026Property profile and owner-reported financial figures.
HƯNG HÓA | Hồ sơ giới thiệu dự án · 23/10/2026Cross-check of property and completion-status disclosures.
Quản Lý Tiền Phòng Hưng Hóa 4.1.xlsx · 30/09/2026Room allocation and equipment exceptions; historical data, not live availability.
Chi Tiêu Xây Nhà Hưng Hóa.xlsx · 24/07/2026Construction payments; allocation and duplicate checks needed before publishing capital totals.
Giấy Tờ Pháp Lý Nhà Hưng HóaFolder located with certificate PDF, land-record lookup and scans; not a completed legal review.

Private source files contain identity, tenancy and payment data. A redacted dossier and a property visit can be requested below. Any ownership transfer, continuation of the lease or investment arrangement requires separate agreement and document review.